Estero

The Estero Flyover is 561 feet long, with spans of 340 feet and 221 feet, and approximately 116 feet wide.  It will extend Estero Parkway over I-75, connecting with Ben Hill Griffin Parkway at a total bid cost of $35 million.

In a Value Engineering redesign, FINLEY replaces twin, cast-in-place concrete box girders with a single, four-steel box girder design.  This solution provided a savings of $1.85 million to Lee County, with the elimination of a large falsework support system, reduced construction time, reduced foundation design requirements and simplified construction methods.  The elimination of much of the falsework also provides relief to an ongoing widening project of I-75 beneath the structure

The redesign calls for a staged temporary tower support scheme to optimize the efficiency of the steel section, which allowed the steel bridge solution to be competitive against the initial cast-in-place design.

The $1.85 million refund to the county is significant because the county is responsible for funding the flyover, and the money will help them meet its budgetary commitments.

The VECP redesign resulted in cost and timesavings for Lee County and the Contractor. The design has been approved and the project is scheduled for completion in February 2009.

Services Provided by FINLEY

• Value Engineering Redesign of Project (Engineer of Record)
• Construction Engineering
• Design of Erection Equipment and Falsework
• On and Off-Site Technical Assistance

OWNER:
Lee County, FL
CLIENT:
ZEP Construction

 

 